This 2 tonne capacity, 1.8m square unit is fabricated entirely from stainless steel, even the cylinders. The baseframe has been strengthened so that it can be supported off the floor to reduce trap points for contamination to accumulate and to make washdown and drainage easier and more efficient. The upright posts in the baseframe support the deck reducing fatigue on the armsets during cross traffic loading. Units similar to this can be used in the food, pharmaceutical, nuclear and off-shore industries.